Myra Project Info
Myra is a freehold condominium at 9 Meyappa Chettiar Road, Singapore 358456, in District 13, in the Toa Payoh planning area. It has 85 residential units in one block of 12 storeys, with 7 or 8 units on each floor, a basement car park and a swimming pool at the 1st storey, on a site of 2,851.1 sqm (30,689.24 sqft) at a plot ratio of 2.1, on Lots 06301M, 06302W, 00692W, 00693V, 05351T, 97439V, 05807T, 05808A, 05809K, 97410W, 97411V and 10940C of Mukim 17. The car park has 70 lots (68 car parking lots and 2 handicap lots) and 22 bicycle lots.
The site, at the corner of Meyappa Chettiar Road and Woodsville Close, was bought en bloc in July 2018 for S$60 million. It is freehold, 30,689 sq ft, and an amalgamation of 17 smaller lots.
Myra was developed by Selangor Dredging Berhad through its subsidiary Tiara Land Pte. Ltd., which holds developer licence C1340. Its Expected TOP is 30 November 2025 and its Expected Legal Completion is 30 November 2028. It was designed by JGP Architecture (S) Pte Ltd, with Pitman Tozer Architects Pte Ltd as design architect, and the main contractor is V3 Construction Pte. Ltd. Myra was awarded CONQUAS Band 1 in 2024. The band is a firm-level record over a rolling six-year window, not a project score.
| Project Name: | Myra |
|---|---|
| District: | 13 |
| Developer: | Tiara Land Pte. Ltd. |
| Address: | 9 Meyappa Chettiar Road (S)358456 |
| Tenure: | Freehold |
| Site Area: | 2,851.1 sqm / 30,689.24 sqft |
| No. Of Units: | 85 residential units |
| No. of Blocks/Storeys: | 1 Block of 12-Storey Residential Flats with Basement Car Park and Swimming Pool |
| No. Of Carparks: | 70 car park lots (68 car parking lots and 2 handicap car parking lots) and 22 bicycle lots |
| Plot Ratio: | 2.1 |
| Architect: | JGP Architecture (S) Pte Ltd |
| Design Architect: | Pitman Tozer Architects Pte Ltd |
| M&E: | HPX Consulting Engineers Pte. Ltd. |
| C&S: | KCL Consultants Pte. Ltd. |
| Quantity Surveyor: | Northcroft Lim Consultants Pte Ltd |
| Landscape Consultant: | Aspex of Design Pte. Ltd. |
| Project Landscape Architect: | Ortus Design Pte. Ltd. |
| Main Contractor: | V3 Construction Pte. Ltd. |
| Facilities: | 25M Lap Pool, Hydro Gym, Hydrotherapy Pool, Children's Playground, Alfresco BBQ Dining, Poolside Walk, Leisure Lawn, Bar Counter, Reflection Garden, Arrival Plaza |
| Developer Licence: | C1340 |
| Expected Date of TOP: | 30 Nov 2025 |
| Expected Date of Legal Completion: | 30 Nov 2028 |
Myra Location Map

Click to open streetdirectory.com map in new window
Potong Pasir MRT Station is a 2-minute walk from Myra, and it is 0.15 km away. The block stands on Meyappa Chettiar Road, with Woodsville Close to its east, in the Toa Payoh planning area.
Myra Facilities: Pools, Hydro Gym and the 25M Lap Pool

Click Here for Enlarged Myra Facilities Siteplan
The communal facilities are on the 1st storey, and interconnected pools gently surround the building. The facilities fall into zones: a north-east quiet zone, a south-east zone for the gym and wellness pools, a south play zone and a north dining area beside the Grand Lobby.
Entrance and arrival: the Guard House, Pedestrian Gate, Arrival Plaza, Reflection Garden, Grand Lobby and Bar Counter.
Leisure and pools: Outdoor Dining, Leisure Lawn, Children’s Playground, Shallow Play Pool, Shallow Pool Deck, Outdoor Showers, Changing Room/Toilet, Outdoor Gym, Hydro Gym, Hydrotherapy Pool, the 25M Lap Pool, Pool Deck, Pool Sunbath Lounger, “Rivulet” Pool Overflow, Alfresco BBQ Dining, Pool View Chill Deck, Poolside Walk and Seating Area.
Security takes the form of an audio intercom, a visitor call panel at the residential lift lobbies in Basement 1 and Level 1, card access to the lift cars and pedestrian gates, and surveillance cameras in the lift cars and designated common areas.
Myra Design: Aluminium Ribbons and the Grand Lobby
The façade is softly rounded, with horizontal aluminium “ribbons” that change in tone upwards, from champagne at the lower floors to muted gold at the top, and that shade the balconies and air-conditioning ledges. At the arrival, a porte cochere leads to a Grand Lobby with a circular skylight, called an oculus, above the planter. The design architect is Pitman Tozer Architects and the local architect JGP Architecture (S).
Myra Fittings: Bosch, Grohe and Geberit
Kitchens: Bosch (or equivalent) appliances for every type: a hob, hood, built-in oven, fridge and washer-cum-dryer.
Bathrooms: a shower set and mixer taps by Grohe (or equivalent), a wash basin and water closet by Geberit (or equivalent), a quartz vanity top and a glass shower compartment.
Floors and doors: engineered wood with timber skirting in the bedrooms, tiles in the bathrooms and kitchens, composite wood on the balconies, a fire-rated timber main door with a digital lockset and built-in timber wardrobes.
Ceilings and cooling: 2.85 m in the master bedroom and the living area of most types, 2.40 m in the entrance, bathrooms and kitchen, and wall-mounted air-conditioning in the living area and bedrooms.
Myra Unit Distribution Chart
The chart maps the 85 homes of Myra across 8 stacks, numbered 01 to 08, over levels 2 to 12: 8 units on each of levels 2 to 9 and 7 on each of levels 10 to 12. Stack 01 is the 1-Bedroom A1, 02 the 2-Bedroom B3, 03 the 2-Bedroom B1 on levels 2 to 9 and the 4-Bedroom D2 on levels 10 to 12, 04 the 2-Bedroom B2 on levels 2 to 8 and B2A on level 9, 05 the 3-Bedroom C1, 06 the 4-Bedroom D1, 07 the 2-Bedroom B4 and 08 the 1-Bedroom A2. Unit numbers read #storey-stack, and level 1 holds the drop-off and communal facilities.